Market
Terminal 3
Harry Reid International Airport
Project Details
TUTOR PERINI AFFILIATES
General Contractor
Contract Amount: $1.2 Billion
Mechanical Subcontractor
Contract Amount: $148 Million
OWNER
Clark County Department of Aviation
LOCATION
Las Vegas, NV
ARCHITECT
PGAL
SIZE
1.9 Million Square Feet
COMPLETION
2012
Project Description
The 14-gate Terminal 3 includes an added terminal building with an elevated roadway structure fronting thefacility, over-roadway pedestrian bridges, underground automated transit system infrastructure, and an aircraftramp. The terminal has its own retail concessions, parking and ticketing.
The 1,900,000-square-foot terminal building includes a basement, three upper levels and roof-levelpenthouses. The building houses a baggage handling system for outbound and inbound processing, and an in-lineexplosives detection system for baggage screening. The building’s infrastructure is designed with extensive cablingfor software interfaces. Other features include dynamic and static signage, way finding systems and Voice-over-Internet Protocol (VoIP). The elevated roadway extends the length of the terminal – approximately 90 feet wide and2,000 feet long. Construction of the elevated roadway includeda concrete box girder with cast concrete columns.
RELATED PROJECTS
LAS D Gates
Awards
2012 Project of the Year - Nevada Contractors Association & AGC
2013 Honor Award Winner - National Terrazzo & Mosaic Association, Inc.
2013 Merit Award for Architecture -AIA Nevada
“Perini's detailed planning, coordination and teamwork were essential to the successful completion of the quality facility that Terminal 3 is.”Rosemary A. Vassiliadis
Director of Aviation
McCarran International Airport
Photo Credits: Dana Hoss Photography