Market
Purple Line Extension, Section 2
Project Details
TUTOR PERINI AFFILIATES
ҹɫè Civil
Design-Build Contractor
Contract Amount: $1.55 Billion
Electrical Subcontractor
Contract Amount: $164 Million
Mechanical Subcontractor
Contract Amount: $34 Million
Mechanical Subcontractor
Contract Amount: $24 Million
OWNER
Los Angeles County Metropolitan Transportation Authority
LOCATION
Los Angeles, CA
ARCHITECT
STV Incorporated
SIZE
2.6 Miles
COMPLETION
2025
Project Description
From the current terminus at Wilshire/Western, the Purple Line Extension will extend westward for aboutnine miles with seven new stations. It will provide a high-capacity, high-speed, dependable alternative for those traveling to and from Los Angeles’s “second downtown.” Section 2 of the three sections will deliver 2.55 miles of twin-bored tunnels and two new stations at Wilshire/Rodeo and Century City Constellation.
In January 2017, Phase Two of the project, which will extend trackage 2.6 miles (4.2 km) further to Century City, was awarded a $1.6 billion grant from the Federal Transit Administration, covering the majority of the $2.6 billion estimated cost of the project. On January 27, the Metro board awarded a $1.37 billion construction contract to a joint venture between ҹɫè and O&G Industries, with construction scheduled to be completed by 2025.