Market
Purple Line Extension, Section 3 Tunnels
Project Details
TUTOR PERINI AFFILIATES
Frontier-Kemper / ҹɫè
Design-Build Contractor
Contract Amount: $468 Million
Support of excavation subcontractor
Contract Amount: $9.2 Million
Mechanical Subcontractor
Contract Amount: $5.8 Million
OWNER
Los Angeles County Metropolitan Transportation Authority
LOCATION
Los Angeles, CA
ARCHITECT
STV Incorporated
SIZE
2.56 Miles
COMPLETION
2023
Project Description
Design-Build project consisting of two 22-foot diameter twin bore subway tunnels. Each tunnel isÌý13,680Ìýlinear feetÌýwith 14 cross-passages.ÌýThe tunnels will be excavated utilizing a Herrenknecht Earth Pressure BalanceÌýTunnel Boring Machine with precast concrete segments as the final lining. ҹɫè is also the Design-Build contractor for the Purple Line Extension Section 3 Stations project thatÌýwill add two additional stations at Wilshire/Westwood and on the U.S. Department of Veterans Affairs property.
Ìý
RELATED PROJECTS
Purple Line Extension, Section 2
Purple Line Extension, Section 3 Stations
Photo Credits: LACMTA